Tuesday, June 30, 2009

Values Quilt Squares

I am glad to see there are others out there working on values quilts. Wish I lived in the Northeast to go to the values quilt class. Can't wait to see what my values quilt actually looks like.

Trimming... still trimming.... More work going into trimming than sewing. I think I am about half done. Although I may start sewing before all the trimming is done.

Tote Done

Just under the deadline I finished the tote bag for my swap partner. It will go in the mail today.
Not sure I totally love the ribbon, but I like it more than not having anything on the side of the tote.
Made a coordinating pouch bag. Surprisingly I still remembered how to make these. I hadn't made a pouch in several weeks. I did find zippers on clearance at Wal-mart for 75 cents. So I might make a few more soon.

Monday, June 29, 2009

Best Compliment Ever

The best compliment ever... Mason was sleeping with his t-shirt quilt this morning. The tote bag is finished although it is missing a little detail. It needs to be post marked by Tuesday so we will see if I add more detail to it or send as is.
Buttery yellow flannel on the inside. That was a remant from JoAnns, but oh so soft. Opps I should say almost finished, I do need to sew on a button.
All the values squares are sewn. Just trimming them before they are sewn together. I did throw out a few during the process. My light/dark match up just didn't look right to me. Think I have 120 squares left.

Sunday, June 28, 2009

T-shirt Quilt Done

T-shirt quilt is finished. Buttercup slept on it the entire time I sewed the binding. I think she claims it as her own.
Mason likes it and that is all that really matters. Too hot to use it this afternoon. But by morning he will be buried under it. Finished out around 55 x70 inches. On to another project.

Saturday, June 27, 2009

T-shirt Quilt

My day started like this. Several projects on my table. Where should I start?
Ended up using a grey woven cotton for the sashing. Found a black and grey plaid flannel for the backing. Funny thing is Mason has now become a quilt critic. All the sudden he has an opinion on how this should look and feel. He walked through the room a few minutes ago and wanted to know when it would be done. I must be doing something right.
Surprised I got this much done today. Even did a couple loads of laundry and saw Transformers with Mason.

Friday, June 26, 2009

The Project List

The infamous project list... wouldn't you like to see some new things on this list. I know I sure would.

Project in the works I want to finish:
T-shirt quilt for Mason
Love is in the air quilt
Hexagon Table Topper
Baby Bibs
Values Quilt

Projects someone is waiting on me to complete:
1 tote bag swap

Projects I want to work on:
Christmas quilts
Sleeveless top for me
Oven Mitts

Seems like there is something missing from this list but I can't think of what it is right now.

The good news is there is only one thing that anyone is expecting me to finish. Mason is still on the mend so we are pretty much tied to the house, unless against my better judgement we go to see the movie Transformers. Kim has a friend spending the night, that seems to be against my better judgement also. Must be the heat getting to me.

Thursday, June 25, 2009

T-shirt Template

Template made from poster board. The inside measurements are 15 inches. I put pins in the corners to mark the placement of the interfacing. Removed the template, put the t-shirt on the ironing board and placed the interfacing corners over the pins. It seems to have worked out.
All the interfacing has been ironed on and all the t-shirts have now been trimed to 15 x 15 inches. Next steps are to finish the pocket and make the monogram M. I did have one major freak out while ironing the interfacing on a white t-shirt. I had a moment that I thought I ironed the interfacing on the right side instead of the wrong side. Said a curse word and all was well. Guess I just had too many other things on my mind.
Mason improving every day. No pain meds at all this after noon for his packing change. His is still sitting more than he should but he is trying to take breaks more often.

Values Quilt Layout

There is a pattern to this. The rows repeat themselves in pairs. Hopefully I won't get too lost sewing them together. Spent last night using the June Tailor ruler marking all of the charms. 64 pairs of light/dark charms. That should end up giving me 128- 4 1/8 inch blocks. 3 1/2 inches after square up and final seam allowance. Too early in the morning to do any more math.

Wednesday, June 24, 2009

June Tailor Ruler

Perfect Half-Square and Quarter-Square Triangle ruler. I picked this up at lunch today. I have read others comments on their blogs that it made triangles much easier. After the pin wheel quilt I realized I could use extra help if it was available. I will let you know how it works out.

And can you believe Joann's does not have grey flannel? How silly is that. The only other color that might have worked was black and I just couldn't do that. Mason would have loved it but I really want grey to make the shirts stand out more. The Hancock Fabric store by my office burned to the ground a few weeks ago. But there is still one close to the house and a Hobby Lobby too. Guess I need to pop in there and look on the way home from work. Gonna be a toss up if I want to stop in this insane heat or just head home.

T-shirt Quilt

This is the layout and plan for Mason's t-shirt quilt.Row three, column two is actually off the sleeve of one of the shirts. I am going to make it into a pocket on the quilt. Row four, column three, I am going to try to applique a M on the fabric from the back of one of the shirts. Thinking a grey flannel for the background of the quilt. At one point I was thinking denim but I don't think he would like the weight of it when done.

The space astronaut is the biggest, just at 12x12 inches. Interfacing is cut 15x15 inches. With at least 1/2 inch seams allowance I think this should work out and give me some extra space. Created a template so I could find the correct positioning of the interfacing for the back of each shirt before I cut it. Had a bad feeling if I cut them to size they would distort before the interfacing was put on.

Hardest part so far was cutting into perfectly good t-shirts. But I knew he wasn't going to wear these any more, they might as well be put to good use.